Gas pipelines in Slovenia
This list ranks all 12 gas pipelines tracked in Slovenia by capacity, including operating, under-construction, planned, shelved and retired projects. 5 of them are operating, with a combined capacity of 9.93 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Rogatec-Cersak Gas Pipeline | Gas pipeline | 5.31 bcm/y | ||
| 2 | Rogatec–Gorizia Gas Pipeline | Gas pipeline | 2.71 bcm/y | ||
| 3 | Rogatec–Gorizia Gas Pipeline | Gas pipeline | 1.91 bcm/y | ||
| 4 | Pince-Lendava-Kidričevo Gas Pipeline | Gas pipeline | 1.54 bcm/y | Proposed | 2028 |
| 5 | Ajdovščina – Lucija Gas Pipeline | Gas pipeline | Construction | 2025 | |
| 6 | Austria–Slovenia Interconnector (SOL) Gas Pipeline | Gas pipeline | Proposed | 2028 | |
| 7 | Austria–Slovenia Interconnector (SOL) Gas Pipeline | Gas pipeline | 1978 | ||
| 8 | Hungary-Slovenia-Italy Interconnector Gas Pipeline | Gas pipeline | Shelved | 2026 | |
| 9 | Kalce-Kastav Gas Pipeline | Gas pipeline | Shelved | 2024 | |
| 10 | Rogatec-Novo Mesto Gas Pipeline | Gas pipeline | |||
| 11 | Vodice-Jarše-Novo mesto pipeline | Gas pipeline | Proposed | 2027 | |
| 12 | Vodice-Jesenice Gas Pipeline | Gas pipeline |