Country profile
Republic of the Congo energy infrastructure
Global Energy Monitor tracks 35 energy facilities in Republic of the Congo, including power plants with 734 MW of operating generating capacity. A further 50 MW is under construction and 441 MW is in planning stages.
Republic of the Congo's energy system at a glance
Republic of the Congo has 734 MW of operating power generation capacity across 5 plants in the Global Energy Monitor dataset. Oil & gas is the largest source, with 534 MW or 73% of the total. It is followed by hydropower (26%) and bioenergy (0.8%).
Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 27% of operating capacity, while coal, oil and gas account for 73%. Wind and solar alone represent 0%.
A further 50 MW of generating capacity is under construction, led by solar (50 MW). Another 441 MW is announced, proposed or in pre-construction.
Beyond power generation, the map covers 1 oil and NGL pipelines, 2 LNG terminals (0.6 mtpa export capacity in operation) and 16 oil and gas fields (13 producing) in Republic of the Congo.
Operating power capacity by technology
- Oil & gas 534 MW 73%
- Hydropower 194 MW 26%
- Bioenergy 6.0 MW 0.8%
| Technology | Operating | Plants operating | Under construction | Planned |
|---|---|---|---|---|
| Oil & gas | 534 MW | 2 | — | — |
| Hydropower | 194 MW | 2 | — | 331 MW |
| Bioenergy | 6.0 MW | 1 | — | 10 MW |
| Solar | — | 0 | 50 MW | 100 MW |
Largest power plants in Republic of the Congo
| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Sounda hydroelectric plantKouilou Department | Hydropower | 600 MW | Shelved | |
| 2 | Centrale Électrique du Congo (CEC) power stationKouilou | Oil & gas | 484 MW | 2010 | |
| 3 | Mourala hydroelectric plantNiari | Hydropower | 230 MW | Pre-construction | |
| 4 | Imboulou hydroelectric plantPlateaux Department | Hydropower | 120 MW | 2011 | |
| 5 | Nyanga hydroelectric plantNiari | Hydropower | 101 MW | Pre-construction | |
| 6 | Congo-Brazzaville solar farm | Solar | 100 MW | Pre-construction | |
| 7 | Moukoukoulou hydroelectric plantBouenza Department | Hydropower | 74 MW | 1979 | |
| 8 | Congo Natural Gas Combined Cycle power plantKouilou | Oil & gas | 50 MW | 2021 | |
| 9 | Ignié solar farmPool Department | Solar | 50 MW | Construction | |
| 10 | Ignié SEZ power stationPool | Bioenergy | 10 MW | Pre-construction |
Pipeline: capacity under construction
- Solar 50 MW 100%
Gas & oil power plants in Republic of the Congo
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Centrale Électrique du Congo (CEC) power stationKouilou | Oil & gas | 484 MW | 2010 | |
| 2 | Congo Natural Gas Combined Cycle power plantKouilou | Oil & gas | 50 MW | 2021 |
Hydropower plants in Republic of the Congo
See all 5 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Sounda hydroelectric plantKouilou Department | Hydropower | 600 MW | Shelved | |
| 2 | Mourala hydroelectric plantNiari | Hydropower | 230 MW | Pre-construction | |
| 3 | Imboulou hydroelectric plantPlateaux Department | Hydropower | 120 MW | 2011 | |
| 4 | Nyanga hydroelectric plantNiari | Hydropower | 101 MW | Pre-construction | |
| 5 | Moukoukoulou hydroelectric plantBouenza Department | Hydropower | 74 MW | 1979 |
Solar farms in Republic of the Congo
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Congo-Brazzaville solar farm | Solar | 100 MW | Pre-construction | |
| 2 | Ignié solar farmPool Department | Solar | 50 MW | Construction |
Bioenergy power plants in Republic of the Congo
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ignié SEZ power stationPool | Bioenergy | 10 MW | Pre-construction | |
| 2 | N'kayi Mill power stationBouenza | Bioenergy | 6.0 MW |
Oil & NGL pipelines in Republic of the Congo
See all 1 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Lianzi-BBLT Oil Pipeline | Oil pipeline | 40,000 boe/d | 2015 |
LNG terminals in Republic of the Congo
See all 2 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Eni Congo FLNG II Terminal | LNG export terminal | 2.40 mtpa | Construction | |
| 2 | Congo FLNG Terminal | LNG export terminal | 0.60 mtpa | 2023 |
Oil & gas fields in Republic of the Congo
See all 16 →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Moho-Bilondo Oil and Gas Field (Republic of the Congo) | Oil & gas field | 56.3 million boe/y | 2008 | |
| 2 | N'Kossa Marine Oil Field (Republic of the Congo) | Oil & gas field | 21.9 million boe/y | ||
| 3 | Banga Kayo (Phase 1) Oil and Gas Field (Republic of the Congo) | Oil & gas field | 12.8 million boe/y | ||
| 4 | Tchibouela Marine Oil and Gas Field (Republic of the Congo) | Oil & gas field | 4.89 million boe/y | 1987 | |
| 5 | Emeraude Marine Oil and Gas Field (Republic of the Congo) | Oil & gas field | 3.77 million boe/y | 1972 |
Frequently asked questions
How much power generation capacity does Republic of the Congo have?
Global Energy Monitor tracks 734 MW of operating power plant capacity in Republic of the Congo, counting plants of all technologies above the trackers' size thresholds.
What share of Republic of the Congo's power capacity is renewable?
Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 27% of operating power capacity in Republic of the Congo. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.
Does Republic of the Congo have nuclear power plants?
No operating nuclear power plant is recorded in Republic of the Congo in the dataset.
Does Republic of the Congo have LNG terminals?
Yes. The dataset lists 2 LNG terminal projects in Republic of the Congo. Operating export capacity: 0.6 mtpa.