Hydropower plants in Mozambique
This list ranks all 10 hydropower plants tracked in Mozambique by capacity, including operating, under-construction, planned, shelved and retired projects. 3 of them are operating, with a combined capacity of 2.17 GW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Cahora Bassa hydroelectric plantTete Province | Hydropower | 2.08 GW | 1974 | |
| 2 | Mphanda Nkuwa hydroelectric plantTete Province | Hydropower | 1.50 GW | Pre-construction | 2031 |
| 3 | Chemba I hydroelectric plantSofala | Hydropower | 600 MW | Pre-construction | 2027 |
| 4 | Lupata hydroelectric plantTete Province | Hydropower | 600 MW | Pre-construction | 2027 |
| 5 | Chemba II hydroelectric plantSofala | Hydropower | 400 MW | Pre-construction | 2027 |
| 6 | Boroma hydroelectric plantTete Province | Hydropower | 300 MW | Pre-construction | 2032 |
| 7 | Pavua hydroelectric plant | Hydropower | 160 MW | Announced | 2028 |
| 8 | Lurio hydroelectric plantCabo Delgado Province | Hydropower | 120 MW | Pre-construction | |
| 9 | Mavuzi hydroelectric plant | Hydropower | 52 MW | 1957 | |
| 10 | Chicamba hydroelectric plant | Hydropower | 44 MW | 1968 |