Country profile

Latvia energy infrastructure

Global Energy Monitor tracks 136 energy facilities in Latvia, including power plants with 3.33 GW of operating generating capacity. A further 225 MW is under construction and 5.59 GW is in planning stages.

3.33 GWOperating power capacity
225 MWUnder construction
136Facilities tracked
Explore Latvia on the map →

Latvia's energy system at a glance

Latvia has 3.33 GW of operating power generation capacity across 94 plants in the Global Energy Monitor dataset. Hydropower is the largest source, with 1.54 GW or 46% of the total. It is followed by oil & gas (33%) and solar (18%).

Low-carbon sources — nuclear, hydropower, wind, solar, geothermal and bioenergy — make up 67% of operating capacity, while coal, oil and gas account for 33%. Wind and solar alone represent 21%.

A further 225 MW of generating capacity is under construction, led by solar (225 MW). Another 5.59 GW is announced, proposed or in pre-construction.

Beyond power generation, the map covers 7 gas pipeline projects (about 446 km in operation) and 2 LNG terminals in Latvia.

Operating power capacity by technology

TechnologyOperatingPlants operatingUnder constructionPlanned
Hydropower1.54 GW3——
Oil & gas1.09 GW3——
Solar585 MW84225 MW1.81 GW
Wind100 MW3—3.76 GW
Bioenergy23 MW1—20 MW

Largest power plants in Latvia

#NameTypeCapacityStatusStart
1Elwind wind farm (Latvia)Wind1.00 GWAnnounced2030
2Kurzeme wind farmWind1.00 GWShelved
3Plavinas hydroelectric plantHydropower894 MWOperating1965
4Riga-2 power stationSalaspilsOil & gas881 MWOperating2009
5Valmiera-Valka wind farmVidzemeWind480 MWAnnounced
6Nīcgale wind farmAugšdaugava MunicipalityWind425 MWAnnounced
7Riga hydroelectric plantVidzemeHydropower402 MWOperating1974
8Balvi solar farmSolar400 MWAnnounced
9Lazas solar farmDienvidkurzeme MunicipalitySolar400 MWAnnounced
10Amata un Bērzkrogs wind farmWind344 MWPre-construction

Pipeline: capacity under construction

Gas & oil power plants in Latvia

See all 3 →
#NameTypeCapacityStatusStart
1Riga-2 power stationSalaspilsOil & gas881 MWOperating2009
2Riga-1 power stationRīgaOil & gas158 MWOperating2005
3Imanta power stationRīgaOil & gas48 MWOperating2006

Hydropower plants in Latvia

See all 3 →
#NameTypeCapacityStatusStart
1Plavinas hydroelectric plantHydropower894 MWOperating1965
2Riga hydroelectric plantVidzemeHydropower402 MWOperating1974
3Kegums hydroelectric plantHydropower240 MWOperating1940

Wind farms in Latvia

See all 21 →
#NameTypeCapacityStatusStart
1Elwind wind farm (Latvia)Wind1.00 GWAnnounced2030
2Kurzeme wind farmWind1.00 GWShelved
3Valmiera-Valka wind farmVidzemeWind480 MWAnnounced
4Nīcgale wind farmAugšdaugava MunicipalityWind425 MWAnnounced
5Amata un Bērzkrogs wind farmWind344 MWPre-construction

Solar farms in Latvia

See all 96 →
#NameTypeCapacityStatusStart
1Balvi solar farmSolar400 MWAnnounced
2Lazas solar farmDienvidkurzeme MunicipalitySolar400 MWAnnounced
3Aizpute solar farmSolar265 MWAnnounced
4Tume solar farmSolar174 MWAnnounced
5Tārgale solar farmCourland regionSolar148 MWPre-construction2026

Bioenergy power plants in Latvia

See all 2 →
#NameTypeCapacityStatusStart
1Gren Jelgava power stationJelgavasBioenergy23 MWOperating2013
2Acone Waste power stationSalaspilsBioenergy20 MWAnnounced2029

Gas pipelines in Latvia

See all 7 →
#NameTypeCapacityStatusStart
1Valdai-Pskov-Riga Gas PipelineNovgorod OblastGas pipeline2.70 bcm/yOperating1972
2Estonia-Latvia Interconnection Gas PipelineHarju CountyGas pipeline2.50 bcm/yOperating1992
3Lithuania-Latvia Interconnection Gas PipelineVilniusGas pipeline2.30 bcm/yOperating1962
4Liepaja–Iecava Gas PipelineGas pipelineOperating2005
5Rauna–Karksi Gas PipelineGas pipelineOperating2005

Oil & NGL pipelines in Latvia

See all 1 →
#NameTypeCapacityStatusStart
1Druzhba Oil PipelineOil pipeline321,315 boe/dMothballed1971

LNG terminals in Latvia

See all 2 →
#NameTypeCapacityStatusStart
1Riga FSRULNG import terminal3.60 mtpaShelved
2Skulte LNG TerminalLNG import terminal3.00 mtpaShelved

Frequently asked questions

How much power generation capacity does Latvia have?

Global Energy Monitor tracks 3.33 GW of operating power plant capacity in Latvia, counting plants of all technologies above the trackers' size thresholds.

What share of Latvia's power capacity is renewable?

Renewables — hydropower, wind, solar, geothermal and bioenergy — make up about 67% of operating power capacity in Latvia. Note that shares of capacity differ from shares of electricity generated, because technologies run for different numbers of hours.

Does Latvia have nuclear power plants?

No operating nuclear power plant is recorded in Latvia in the dataset.

Does Latvia have LNG terminals?

Yes. The dataset lists 2 LNG terminal projects in Latvia.

Special projects