Gas & oil power plants in Ireland
This list ranks all 35 gas & oil power plants tracked in Ireland by capacity, including operating, under-construction, planned, shelved and retired projects. 20 of them are operating, with a combined capacity of 5.84 GW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Coolpowra power plantConnaught | Oil & gas | 1.16 GW | Announced | 2029 |
| 2 | Kilshane power stationLeinster | Oil & gas | 973 MW | Construction | 2028 |
| 3 | Huntstown power stationLeinster | Oil & gas | 796 MW | 2002 | |
| 4 | Derrygreenagh power plantLeinster | Oil & gas | 710 MW | Pre-construction | |
| 5 | Aghada power stationMunster | Oil & gas | 701 MW | 1980 | |
| 6 | Shannon LNG Power PlantMunster | Oil & gas | 600 MW | Pre-construction | |
| 7 | Poolbeg power stationLeinster | Oil & gas | 555 MW | 1994 | |
| 8 | Great Island power stationLeinster | Oil & gas | 460 MW | 2015 | |
| 9 | Whitegate power stationMunster | Oil & gas | 445 MW | 2010 | |
| 10 | Dublin Bay power stationLeinster | Oil & gas | 405 MW | 2002 | |
| 11 | Tynagh power stationConnaught | Oil & gas | 404 MW | 2006 | |
| 12 | Tynagh North power stationConnaught | Oil & gas | 350 MW | Pre-construction | |
| 13 | Cashla Peaker Power StationConnaught | Oil & gas | 334 MW | Pre-construction | 2028 |
| 14 | Castlelost Flexgen power stationLeinster | Oil & gas | 275 MW | 2024 | |
| 15 | Echelon DUB10 power stationLeinster | Oil & gas | 266 MW | 2026 | |
| 16 | Shannonbridge power stationLeinster | Oil & gas | 264 MW | 2024 | |
| 17 | Microsoft Dublin Data Center power stationLeinster | Oil & gas | 258 MW | 2026 | |
| 18 | Echelon DUB20 power stationLeinster | Oil & gas | 249 MW | Construction | 2027 |
| 19 | North Wall power stationLeinster | Oil & gas | 210 MW | 2023 | |
| 20 | Art Data Centre power stationMunster | Oil & gas | 200 MW | Pre-construction | 2027 |
| 21 | Herbata Data Centre power stationLeinster | Oil & gas | 180 MW | Pre-construction | |
| 22 | Kentstown power plantLeinster | Oil & gas | 180 MW | Pre-construction | |
| 23 | Sealrock power stationMunster | Oil & gas | 170 MW | 2005 | |
| 24 | Platin power stationLeinster | Oil & gas | 170 MW | Pre-construction | 2028 |
| 25 | Grange Castle Echelon power stationLeinster | Oil & gas | 120 MW | 2025 | |
| 26 | Bellacorick power stationConnaught | Oil & gas | 114 MW | Shelved | |
| 27 | Cushaling power stationLeinster | Oil & gas | 112 MW | 2010 | |
| 28 | Rhode power stationLeinster | Oil & gas | 104 MW | 2004 | |
| 29 | Tawnaghmore power stationConnaught | Oil & gas | 104 MW | 2003 | |
| 30 | Monksland power stationConnaught | Oil & gas | 100 MW | Construction | 2026 |
| 31 | Profile Park power stationLeinster | Oil & gas | 100 MW | Construction | 2026 |
| 32 | Echelon DUB30 power stationLeinster | Oil & gas | 90 MW | Pre-construction | |
| 33 | Ringsend Flexgen power stationLeinster | Oil & gas | 65 MW | ||
| 34 | Corduff Flexgen power stationLeinster | Oil & gas | 64 MW | 2024 | |
| 35 | Winthrop Dublin power stationLeinster | Oil & gas | 59 MW | 2024 |