Gas pipelines in Iraq

This list ranks all 18 gas pipelines tracked in Iraq by capacity, including operating, under-construction, planned, shelved and retired projects. 12 of them are operating, with a combined capacity of 44.4 bcm/y.

Open the interactive map →
#NameTypeCapacityStatusStart
1North Rumela-Al-Najaf Gas PipelineBasrahGas pipeline94.2 bcm/yShelved
2Rumela-Nasriyaha Gas PipelineBasrahGas pipeline10.4 bcm/yOperating
3North Rumela-Khor Al-Zubair Gas PipelineBasrahGas pipeline10.0 bcm/yOperating
4National Gas PipelineSaladinGas pipeline8.69 bcm/yOperating
5Basra-Ceyhan Gas PipelineBasraGas pipeline5.00 bcm/yProposed
6Khor Al-Zubair-Hartha Gas PipelineBasrahGas pipeline4.80 bcm/yOperating
7Khormor-Pirdawood PP Gas PipelineSulaymaniyahGas pipeline3.40 bcm/yOperating2008
8West Qurna-Baghdad Gas PipelineBasrahGas pipeline2.45 bcm/yOperating1983
9Taji-South Baghdad Gas PipelineBaghdadGas pipeline2.00 bcm/yOperating
10Baiji-Al Mushraq Gas PipelineSaladinGas pipeline1.64 bcm/yOperating
11Khormor-Jambur-Kirkuk Gas PipelineSulaymaniyahGas pipeline1.02 bcm/yOperating1980
12Zubair-Faw Gas Pipeline IraqBasrahGas pipeline1.02 bcm/yShelved
13Baiji-K3-Al Kaem Gas PipelineSaladinGas pipeline0.02 bcm/yOperating
14Al-Ahdab-Al-Zubaydia PWR St Gas PipelineWasitGas pipelineOperating
15Erbil-Duhok Gas PipelineKurdistanGas pipelineConstruction
16Khormor-Erbil Gas PipelineKurdistanGas pipelineConstruction
17Shouibah-Khor Al-Zubair Gas PipelineBasrahGas pipelineOperating
18West Qurna-Rumela Gas PipelineGas pipelineConstruction2025

Special projects