Wind farms in India (page 18)
This list ranks all 876 wind farms tracked in India by capacity, including operating, under-construction, planned, shelved and retired projects. 621 of them are operating, with a combined capacity of 38.9 GW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 851 | Kethanur Wind Farms wind farmTamil Nadu | Wind | 11 MW | ||
| 852 | Kottamangalam RWEL 50 wind farmTamil Nadu | Wind | 11 MW | ||
| 853 | Pohara Baramsar wind farmRajasthan | Wind | 11 MW | 2010 | |
| 854 | Rathedi wind farmMadhya Pradesh | Wind | 11 MW | 2009 | |
| 855 | AMP Hybrid SECI XII wind farmRajasthan | Wind | 10 MW | Pre-construction | |
| 856 | Belgaum (Giriraj) wind farmKarnataka | Wind | 10 MW | 2012 | |
| 857 | Bidadi wind farmKarnataka | Wind | 10 MW | ||
| 858 | Chitradurga (India Power) wind farmKarnataka | Wind | 10 MW | 2006 | |
| 859 | Ecoren Cardea wind farmKarnataka | Wind | 10 MW | ||
| 860 | Gujarat (Bluepine) wind farmGujarat | Wind | 10 MW | Pre-construction | |
| 861 | Hirevadatti Mundargi Gadag wind farmKarnataka | Wind | 10 MW | 2006 | |
| 862 | Jamanvada (GACL) I wind farmGujarat | Wind | 10 MW | ||
| 863 | Jamanvada (GACL) II wind farmGujarat | Wind | 10 MW | ||
| 864 | Kasturi Rengapuram wind farmTamil Nadu | Wind | 10 MW | 2009 | |
| 865 | Kundur wind farmKarnataka | Wind | 10 MW | 2015 | |
| 866 | Muppandal Madras wind farmTamil Nadu | Wind | 10 MW | ||
| 867 | Nakhatrana Sn1 (GIPCL) wind farmGujarat | Wind | 10 MW | 2016 | |
| 868 | Nakhatrana Sn5 (GIPCL) wind farmGujarat | Wind | 10 MW | 2016 | |
| 869 | Rajpara (GACL) I wind farmGujarat | Wind | 10 MW | ||
| 870 | Rajpara (GACL) II wind farmGujarat | Wind | 10 MW | ||
| 871 | Ramagiri wind farmAndhra Pradesh | Wind | 10 MW | 1995 | |
| 872 | Rastha wind farmTamil Nadu | Wind | 10 MW | 2012 | |
| 873 | Tenkasi wind farmTamil Nadu | Wind | 10 MW | ||
| 874 | Tinwari wind farmRajasthan | Wind | 10 MW | ||
| 875 | Vejalpar (Giriraj) II wind farmGujarat | Wind | 10 MW | ||
| 876 | Vijayapura (Giriraj) I wind farmKarnataka | Wind | 10 MW | 2018 |