Hydropower plants in Guatemala
This list ranks all 11 hydropower plants tracked in Guatemala by capacity, including operating, under-construction, planned, shelved and retired projects. 10 of them are operating, with a combined capacity of 952 MW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Pueblo Viejo hydroelectric plantBaja Verapaz | Hydropower | 300 MW | 1983 | |
| 2 | Renace 2 Phase 1 hydroelectric plantAlta Verapaz | Hydropower | 117 MW | 2016 | |
| 3 | Xacbal hydroelectric plantQuiché | Hydropower | 97 MW | 2010 | |
| 4 | Palo Viejo hydroelectric plantQuiché | Hydropower | 87 MW | 2012 | |
| 5 | Aguacapa hydroelectric plantGuatemala Department | Hydropower | 80 MW | 1982 | |
| 6 | Renace hydroelectric plantAlta Verapaz | Hydropower | 68 MW | 2004 | |
| 7 | Jurun Marinala hydroelectric plantEscuintla | Hydropower | 60 MW | 1970 | |
| 8 | Oxec-II hydroelectric plantAlta Verapaz | Hydropower | 56 MW | 2018 | |
| 9 | El Canada hydroelectric plantQuetzaltenango | Hydropower | 48 MW | 2003 | |
| 10 | Las Vacas hydroelectric plantGuatemala Department | Hydropower | 39 MW | 2002 | |
| 11 | Río Hondo-II hydroelectric plantZacapa | Hydropower | 32 MW | Shelved |