Solar farms in Germany (page 62)

This list ranks all 8,292 solar farms tracked in Germany by capacity, including operating, under-construction, planned, shelved and retired projects. 7,579 of them are operating, with a combined capacity of 38.0 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
3051EDEKA Nord Lager Neumünster Nord solar projectSchleswig-HolsteinSolar3.8 MWOperating2025
3052Eisenhüttenstadt Landweg solar farmBrandenburgSolar3.8 MWOperating2013
3053Fangana Mobilien Verwaltungsgesellschaft mbH Teil 1 solar farmBrandenburgSolar3.8 MWOperating2009
3054Forst solar farmBrandenburgSolar3.8 MWOperating2013
3055Freiflächenanlage 5MH OT1 10/24 AS solar projectBayernSolar3.8 MWOperating2024
3056Friedland Datze 2a (Kleinbahn) solar farmMecklenburg-VorpommernSolar3.8 MWOperating2012
3057Fuchsloch EEG solar farmBayernSolar3.8 MWOperating2022
3058Hellsiek I solar farmNordrhein-WestfalenSolar3.8 MWOperating2016
3059Hochfeld solar farmNordrhein-WestfalenSolar3.8 MWOperating2016
3060Jocksdorf Schott FFA Freiflächenanlage solar farmBrandenburgSolar3.8 MWOperating2012
3061KISolar GmbH solar projectBayernSolar3.8 MWOperating2025
3062Klockenhagen solar farmMecklenburg-VorpommernSolar3.8 MWOperating2012
3063Lauchhammer solar farmBrandenburgSolar3.8 MWOperating2013
3064LuK Freifläche Ottengrüner Einzel 2 solar projectBayernSolar3.8 MWOperating2024
3065Neustadt Süd 1.1 SOL solar farmHessenSolar3.8 MWOperating2022
3066Oberwesterwaldbahn (Dornburg) solar farmHessenSolar3.8 MWOperating2020
3067Pfenning Monsheim BA 2 solar farmRheinland-PfalzSolar3.8 MWOperating2022
3068PV Anlage Am Tower 8 solar projectBayernSolar3.8 MWOperating2023
3069PV BE T01 solar projectBaden-WürttembergSolar3.8 MWOperating2026
3070PV Carports Hodenhagen solar projectNiedersachsenSolar3.8 MWPre-construction
3071PV Freiflächenanlage Flossing solar projectBayernSolar3.8 MWOperating2025
3072PV Hof Anlage 1 4000 solar farmBayernSolar3.8 MWOperating2022
3073PV Im Gewerbepark 1 Dachanlagen Großanlage solar farmBayernSolar3.8 MWOperating2011
3074PV Ötigheim solar projectBaden-WürttembergSolar3.8 MWOperating2024
3075PV Otterzhofen NordOst solar projectBayernSolar3.8 MWPre-construction2026
3076PV Wefensleben Inno solar projectSachsen-AnhaltSolar3.8 MWPre-construction2026
3077PV ZiegerlauchII solar farmBaden-WürttembergSolar3.8 MWOperating2020
3078PVA Borau BA II solar farmSachsen-AnhaltSolar3.8 MWOperating2022
3079PVA Elsnig FF solar farmSachsenSolar3.8 MWOperating2010
3080PVA Ford solar projectNordrhein-WestfalenSolar3.8 MWOperating2012
3081PVA Gattendorf 2 solar farmBayernSolar3.8 MWOperating2016
3082PVA Gerstungen II solar farmThüringenSolar3.8 MWOperating2012
3083PVA Gumpen solar projectHessenSolar3.8 MWOperating2023
3084PVA Inden Solarpark solar farmNordrhein-WestfalenSolar3.8 MWOperating2011
3085PVA Kamenz Biehla solar farmSachsenSolar3.8 MWOperating2012
3086PVA Kodersdorf solar farmSachsenSolar3.8 MWOperating2011
3087PVA Nemsdorf 2 solar farmSachsen-AnhaltSolar3.8 MWOperating2016
3088PVA Neuses 1 I solar projectBayernSolar3.8 MWPre-construction
3089PVA Neuses 1 II solar projectBayernSolar3.8 MWOperating2025
3090PVA Oschatz 2 solar farmSachsenSolar3.8 MWOperating2018
3091PVA Weira solar farmThüringenSolar3.8 MWOperating2015
3092PVA Wittenberge I solar farmBrandenburgSolar3.8 MWOperating2021
3093PVAnlage Halberstadt Halle A BA2 solar projectSachsen-AnhaltSolar3.8 MWOperating2024
3094PVAnlage Halberstadt Halle B BA2 solar projectSachsen-AnhaltSolar3.8 MWOperating2024
3095PVF Rohr Teilanlage 1 solar farmThüringenSolar3.8 MWOperating2011
3096PVFreiflächenanlage Bad Langensalza 2 1.BA solar farmThüringenSolar3.8 MWOperating2021
3097PVPark Gera II solar farmThüringenSolar3.8 MWOperating2011
3098PVPark Kirrweiler TR02 solar projectRheinland-PfalzSolar3.8 MWOperating2024
3099Salzwedel 3.2 solar projectSachsen-AnhaltSolar3.8 MWOperating2024
3100Schuon Solarpark Nord GmbH solar farmSachsen-AnhaltSolar3.8 MWOperating2016

Special projects