Geothermal power plants in Costa Rica
This list ranks all 4 geothermal power plants tracked in Costa Rica by capacity, including operating, under-construction, planned, shelved and retired projects. 3 of them are operating, with a combined capacity of 234 MW.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Miravalles geothermal power plant | Geothermal | 139 MW | 1994 | |
| 2 | Borinquen geothermal power projectGuanacaste | Geothermal | 110 MW | Construction | 2027 |
| 3 | Las Pailas geothermal power plant | Geothermal | 90 MW | 2011 | |
| 4 | Boca de Pozo geothermal power plant | Geothermal | 5.0 MW | 1994 |