Hydropower plants in Bhutan

This list ranks all 16 hydropower plants tracked in Bhutan by capacity, including operating, under-construction, planned, shelved and retired projects. 8 of them are operating, with a combined capacity of 3.46 GW.

Open the interactive map →
#NameTypeCapacityStatusStart
1Sankosh hydroelectric plantDagana DistrictHydropower4.06 GWPre-construction
2Kuri Gongri hydroelectric plantMongar DistrictHydropower2.64 GWPre-construction
3Punatsangchhu I hydroelectric plantWangdue Phodrang DistrictHydropower1.20 GWConstruction
4Dorjilung hydroelectric plantLhuntse DistrictHydropower1.13 GWPre-construction
5Punatsangchhu II hydroelectric plantWangdue Phodrang DistrictHydropower1.02 GWOperating2025
6Tala hydroelectric plantChukha DistrictHydropower1.02 GWOperating2006
7Chamkharchhu I hydroelectric plantZhemgang DistrictHydropower770 MWPre-construction
8Mangdechhu hydroelectric plantTrongsa DistrictHydropower720 MWOperating2019
9Kholongchu hydroelectric plantTrashiyangtse DistrictHydropower600 MWPre-construction2029
10Kheng Shingkhar hydroelectric plantZhemgang DistrictHydropower570 MWShelved
11Wangchu hydroelectric plantChukha DistrictHydropower570 MWPre-construction
12Chhukha hydroelectric plantChukha DistrictHydropower336 MWOperating1986
13Dagachhu hydroelectric plantDagana DistrictHydropower126 MWOperating2015
14Nikachhu hydroelectric plantTrongsa DistrictHydropower118 MWOperating2024
15Basochhu hydroelectric plantWangdue Phodrang DistrictHydropower64 MWOperating2002
16Kurichhu hydroelectric plantMongar DistrictHydropower60 MWOperating2001

Special projects