Gas pipelines in Armenia
This list ranks all 6 gas pipelines tracked in Armenia by capacity, including operating, under-construction, planned, shelved and retired projects. 4 of them are operating, with a combined capacity of 6.41 bcm/y.
Open the interactive map →| # | Name | Type | Capacity | Status | Start |
|---|---|---|---|---|---|
| 1 | Ghazakh-Yerevan Gas Pipeline | Gas pipeline | 4.70 bcm/y | 1960 | |
| 2 | Iran-Armenia Gas Pipeline | Gas pipeline | 2.27 bcm/y | 2007 | |
| 3 | Krasny Most-Sevkar-Berd Gas Pipeline | Gas pipeline | 1.71 bcm/y | 1993 | |
| 4 | Ilichevsk-Yerevan Gas Pipeline | Gas pipeline | 1984 | ||
| 5 | North Caucasus-Transcaucasia Gas PipelineNorth Ossetia | Gas pipeline | 1965 | ||
| 6 | Vanadzor-Gyumri Gas Pipeline | Gas pipeline | 1963 |